Which climb is actually steeper?
Grade (%) = elevation gained ÷ horizontal run × 100, with both measurements in the same unit.
A worked example
A 300 m rise over 3 km and a 150 m rise over 1.5 km both average a 10% grade, about 5.71°. The second climb gains half as much elevation at the same average angle.
Can I use total trail length for the horizontal run?
Use horizontal map distance for the section you are comparing. A distance measured along the slope is longer. For rolling terrain, use a single climb between known elevations. An average hides short, steep sections and says nothing about footing or weather. How the U.S. Forest Service describes trail grade.
Try another activity: Will one more minute cost $4?
Embed this activity on another website
Copy this HTML into a page that supports iframes.